Alstom Micom P40 AGILE MICOM P141
Application Scenarios
1. Power Distribution Networks- MV Feeder Protection: Overcurrent/earth fault protection for 6.6–33kV substations .
- Fault Location: Pinpoints cable/line faults via impedance-based algorithms .
- Motor/Generator Backup: Protects critical drives in plants using directional overcurrent .
- Microgrid Control: Manages grid-tie transitions and load balancing .
- Solar/Wind Farm Collection Grids: Synchronizes distributed resources with autoreclosing .
- Rail Electrification: Protects catenary systems with distance protection .