Digital guide

You are here:

Atlas Copco PF4002-G-HW

Product Overview:
The PF4002-G-HW is the highest-capacity unit in this archive, delivering 1400 CFM of free air. Skid-mounted for semi-permanent deployment at large-scale mining, quarrying, and major infrastructure projects. Hot Weather rated for reliable operation in extreme heat.

Detailed content

Technical Specifications:

Parameter Value
Free Air Delivery (FAD) 1400 CFM (39.6 m³/min) at 100 psi (6.9 bar)
Working Pressure Range 100 – 175 psi (6.9 – 12 bar)
Engine Model Perkins 1106D-E66TA, 6-cylinder turbocharged diesel
Engine Power Output 175 HP (130 kW) at 2200 RPM
Fuel Tank Capacity 380 L (100 US gal)
Fuel Consumption 38.0 L/hr (10.0 US gal/hr) at full load
Noise Level (LwA) 102 dB(A)
Dimensions (L × W × H) 4500 × 2200 × 2500 mm (14.8 × 7.2 × 8.2 ft)
Operating Weight 8200 kg (18,078 lb)
Cooling System Air-cooled with Hot Weather upgrade (dual radiator)

Structure & Design Features:

  • Heavy-duty fabricated steel skid with integrated lifting lugs
  • 6-cylinder Perkins engine for high-altitude and high-demand operation
  • Dual radiator configuration for HW thermal management
  • Large-capacity fuel tank supports 7+ hours of continuous operation

Advantages & Highlights:

  • 1400 CFM supports up to four large rock drills or six medium drills simultaneously
  • Perkins 1106D engine delivers 175 HP — class-leading power-to-weight ratio
  • Skid design provides maximum stability for continuous 24/7 operation
  • Dual radiator HW system maintains engine temperature below 95°C at 55°C ambient

Applicable Industries:

  • Large-scale mining operations
  • Major highway and railway tunneling
  • Quarry production with multiple drill rigs
  • Power generation support (pneumatic tools)

Installation Requirements:

  • Reinforced concrete pad minimum 5m × 3m
  • Crane with minimum 10-tonne capacity for placement
  • 3m clearance on all sides for airflow and maintenance access
  • Electrical connection: 24V starting system with 12V auxiliary

Usage Precautions:

  • Engine oil change every 250 hours — use Perkins-approved 15W-40 oil
  • Dual radiator requires inspection of both cores every 500 hours
  • Do not exceed 175 psi working pressure — relief valve set at 185 psi

You may also like