Atlas Copco PF3007-G-HW
Product Overview:
The PF3007-G-HW is a skid-mounted portable air compressor delivering 850 CFM with Hot Weather capability. Powered by a Perkins 4-cylinder diesel engine, it targets semi-permanent installations where compact footprint and stability are prioritized over road mobility.
Detailed content
Technical Specifications:
| Parameter | Value |
|---|---|
| Free Air Delivery (FAD) | 850 CFM (24.1 m³/min) at 100 psi (6.9 bar) |
| Working Pressure Range | 100 – 175 psi (6.9 – 12 bar) |
| Engine Model | Perkins 1104D-44T, 4-cylinder turbocharged diesel |
| Engine Power Output | 110 HP (82 kW) at 2200 RPM |
| Fuel Tank Capacity | 190 L (50 US gal) |
| Fuel Consumption | 21.5 L/hr (5.7 US gal/hr) at full load |
| Noise Level (LwA) | 96 dB(A) |
| Dimensions (L × W × H) | 3100 × 1800 × 2100 mm (10.2 × 5.9 × 6.9 ft) |
| Operating Weight | 4600 kg (10,141 lb) |
| Cooling System | Air-cooled with Hot Weather upgrade |
Structure & Design Features:
- Heavy-duty steel skid with four forklift pockets
- Perkins 1104D engine — same powertrain as PF3107 for proven reliability
- HW package: upgraded radiator, high-temp thermostat, reinforced hose routing
- Compact footprint — fits in standard 20ft shipping container
Advantages & Highlights:
- 110 HP Perkins engine delivers 850 CFM — higher pressure capability than PF3000-C
- Skid design provides 300 kg weight saving vs. wheeled equivalent
- HW rated for continuous operation at 50°C+ ambient temperature
- Suitable for single large rock drill or dual medium drills at 150 psi
Applicable Industries:
- Quarry and aggregate production (semi-permanent)
- Road construction staging
- Water well drilling
- Rental fleet for hot-climate markets
Installation Requirements:
- Concrete pad or compacted gravel minimum 3.5m × 2.0m
- Forklift or crane for placement — do not drag skid on ground
- 2m intake clearance, 3m exhaust clearance mandatory
Usage Precautions:
- Perkins 1104D oil change: every 250 hours using 15W-40 CI-4 rated oil
- HW radiator fins must be cleaned every 200 hours in dusty environments
- Maximum working pressure: 175 psi — do not adjust relief valve
- Transport only on flatbed truck — skid unit is not road-towable












